Tender for UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED - NTID 31432948
UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED
Vrindavan, Uttar Pradesh, India
NTID 31432948
- Opening Date : Wed 12th April, 2023
- Closing Date : Mon 10th April, 2023
- ₹ 1990000.00
- NTID 31432948
Works For Increasing Capacity From 2x63 Mva To 3x63 Mva With Construction Of Transformer Bay And Other Associated Works At 132 Kv Sub-station Vrindavan Under Etd Mathura
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20000.00 -
Document Cost
590.00 -
Estimated Cost
1990000.00
BOQ Items Total Items : 95 | Total Qty : 5244
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction of 132 KV Transfer Bus bay , 63 MVA Transformer bay, Erection of 2 Nos capacitor bank | ||
2 | Erection of main and auxiliary structure consisting of columns, beams, peaks, masts etc. structure required for installation of Main /Transfer bus, Jack busbar, isolators, P.I., CTs., L.As. and all other equipments. The job consists of shifting of all material i.e. conductor, fittings, structure parts, nuts, bolts, washer etc. from store to site of erection, erection of structure as per relevant drawing and practices using flat and spring washer with each bolt. Matching of holes, cutting, matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost. | 27 | MT |
3 | Dismantling of complete capacitor bank including jack bus & structure (ALP 10 NO, ABL-6 NO), CCM-4 No., CGM-2 No. series reactor 08 Nos. NCT-04 Nos., PT-03 Nos. capacitor bank cells 04 unit, Circuit Breaker- 02 No, CT-06 No, Bus isolator -02 No, Line isolator -04 No, BCT-01 Nos. etc. Opening of cable termination at CB and , CT end, PT end , opening of inter connection/jumper capacitor bank bay between 33 KV bus to BI to CB to CT to LI to capacitor Bank etc by opening earthing and shifting dismantled material from site to store /designated place with in S/S boundry and other associated work to complete the job satisfactory as per direction of supervising Engineer. | 2 | No. |
4 | Erection of following equipments as per instruction manual of various equipments and technical specifications including shifting of material/equipments from store to erection site including all other associated work to complete the job satisfactorily. | ||
5 | 132 KV CB | 1 | No. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane