- Home
- >
- Tender
- >
- Rajasthan Tender
- >
- Department of PUBLIC HEALTH ENGINEERING DEPARTMENT
- >
NTID 43623194
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowWork Of Construction Of Source in KOTPUTLI - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Work Of Construction Of Source" in KOTPUTLI, India.
- Opening Date : Wed 11th February, 2026
- Closing Date : Tue 10th February, 2026
- ₹ 34039000.00
- NTID 43623194
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
680780.00 -
Document Cost
5000.00 -
Estimated Cost
34039000.00
BOQ Items Total Items : 141 | Total Qty : 546029.37
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Tubewell Drilling Work | ||
| 2 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. Nominal bore 200 mm dia. | 420.00 | Mtr |
| 3 | Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and upto 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 120.00 | Mtr |
| 4 | Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 200 mm dia. | 450.00 | Mtr |
| 5 | Add 15% extra on above item (Item No 2.3.1 to 2.3.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 180.00 | Mtr |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054