- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Public Works Department
- >
NTID 44939923
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowWidening Strengthening Of Khur in Khurja - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Widening Strengthening Of Khur" in Khurja, India.
Public Works Department
Khurja, Uttar Pradesh, India
NTID 44939923
- Opening Date : Mon 27th April, 2026
- Closing Date : Mon 27th April, 2026
- ₹ 17850000.00
- NTID 44939923
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1093000.00 -
Document Cost
2714.00 -
Estimated Cost
17850000.00
BOQ Items Total Items : 20 | Total Qty : 17278206.84
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | PART A Bituminous Scarifying the existing bituminous surface to a depth of 50 mm and disposel of scarified material with in all lifts and lead upto 100 meters As per derection of Engineer incharge Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | 1800.00 | Sqm |
| 2 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 100 m Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | 1170.00 | Cum |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | 10630.00 | Cum |
| 4 | Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway Cuttingand excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | 1175.00 | Cum |
| 5 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | 1480.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054