- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Public Works Department
- >
NTID 43080774
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowWidening And Strengthning Work in Bareilly - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Widening And Strengthning Work" in Bareilly, India.
Public Works Department
Bareilly, Uttar Pradesh, India
NTID 43080774
- Opening Date : Mon 15th December, 2025
- Closing Date : Mon 15th December, 2025
- ₹ 86142039.00
- NTID 43080774
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1765000.00 -
Document Cost
2725.00 -
Estimated Cost
86142039.00
BOQ Items Total Items : 24 | Total Qty : 120587.96
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes and removing of tree roots (which was left after cutting of tree) in widening portion, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m Clause 301. including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) table no. 301-3.6. | 11546.67 | Cum. |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) | 30166.90 | Cum. |
| 3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) | 1922.80 | Cum. |
| 4 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Carted Earth Work 2.00 Km ) | 655.50 | Cum. |
| 5 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) | 9108.00 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054