Inquiry NowWidening And Strengthening Of in Jaunapur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Widening And Strengthening Of " in Jaunapur, India.
Public Works Department
Jaunapur, Uttar Pradesh, India
NTID 43082089
- Opening Date : Mon 15th December, 2025
- Closing Date : Mon 15th December, 2025
- ₹ 118200000.00
- NTID 43082089
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2364000.00 -
Document Cost
5590.00 -
Estimated Cost
118200000.00
BOQ Items Total Items : 34 | Total Qty : 181237.67
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (including cost of material T&P labour but excluding GST) | 14250.00 | sqm |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (including cost of material T&P labour but excluding GST) | 3850.00 | Cum |
| 3 | Construction of Embankment with Material Deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (including cost of material T&P labour but excluding GST) | 3505.50 | Cum |
| 4 | Construction of Embankment with Material obtained from Right of way:-Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (including cost of material T&P labour but excluding GST) | 23500.00 | Cum |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (including all taxes, labour cess etc but excluding GST.) | 3639.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054