Inquiry NowWbphed ee bhm niet 25 25-26 17 in Birbhum - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Wbphed ee bhm niet 25 25-26 17" in Birbhum, India.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Birbhum, West Bengal, India
NTID 43023640
- Opening Date : Mon 5th January, 2026
- Closing Date : Fri 2nd January, 2026
- ₹ 512412.00
- NTID 43023640
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10248.00 -
Document Cost
Refer Documents -
Estimated Cost
512412.00
BOQ Items Total Items : 9 | Total Qty : 4702
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Withdrawing and relaying of DI/CI pipes / AC pipe after excavation of earth and with the help of chain pully derrick etc. by dismantling & jointing by rubber gasket joint or lead joint or flange joint and stacking the withdrawn pipes and specials at site store /road flank, godown etc. all complete in the excavated same trench & as per direction of EIC. b) 150 mm dia to 200 mm dia | 1600.00 | Mtr. |
| 2 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer s test certificate for UPVC pipe & specials to be produced before laying of pipe line. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. f) 160mm(OD) | 150.00 | Mtr |
| 3 | 140mm(OD) | 50.00 | Mtr |
| 4 | Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source). A) For UPVC/HDPE Pipe a) 160 mm | 1400.00 | Mtr. |
| 5 | a) 140 mm | 50.00 | Mtr. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054