- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Irrigation and Waterways Department
- >
NTID 45171328
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowWbiwsdokcsd-xenit-07e25-26 3rd in Bankura - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Wbiwsdokcsd-xenit-07e25-26 3rd" in Bankura, India.
Irrigation and Waterways Department
Bankura, West Bengal, India
NTID 45171328
- Opening Date : Fri 22nd May, 2026
- Closing Date : Fri 22nd May, 2026
- ₹ 464712.00
- NTID 45171328
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
9294.00 -
Document Cost
Refer Documents -
Estimated Cost
464712.00
BOQ Items Total Items : 3 | Total Qty : 6210.1695
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 5858.650 | Sq.m. |
| 2 | Water Bound Macadam Sub Base Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5 th Revision). (ii) For Construction of Sub Base by consolidating Laterite (90 mm to 45 mm): Note: Add cost at site of 1.45 m of materials to arrive at the complete rate. | 125.5425 | Cu.m. |
| 3 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. Note: Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67. (The payment is to be made on the basis of the finished compacted volume of moorum.) | 225.977 | Cu.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054