Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Urgent Stabilisation Of Steep " in Salcete, India.
- Opening Date : Fri 20th March, 2026
- Closing Date : Wed 18th March, 2026
- ₹ 10545685.00
- NTID 44341977
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
210914.00 -
Document Cost
10000.00 -
Estimated Cost
10545685.00
BOQ Items Total Items : 10 | Total Qty : 18272.1
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation of foundation of structures of culvert, abntments piers, retaining wall etc in all types of strata comprising any of the materials such as soil, silt, clay gravel murrum of all varieties shingles pebbles all types of conglomerates, laterite rock, ordinary soft rock, disintegrated rock fissured rock shuttered decomposed rock or weathered rock and all such other materials as described under Appendix "A" to those specification either in full or parts as the case may be mechanical mean or any approved method or methods as the case may be convenient or permitted inclusive of chiselling, wedging blasting prohibited etc. in all conditions such as dry moist saturated submerged foul conditions etc. and as directed by the Engineer in - charge including dressing of sides ramming of bottoms including getting out the excavated soft/rock to be levelled & neatly dressed including setting out construction of shoring and bracing removal of stumps & other deleterious matter, dressing of sides & bottom, black filling the excavation earth pumping and bailing of water, carriage and disposal of excavated material barricading danger lighting guarding and disposal of excavated earth as directed by the Engineer - in Charge including all leads and lifts etc. complete. | 362.88 | Cu.m |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 51.84 | Cu.m |
| 3 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete. | 426.66 | Sq.m. |
| 4 | b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 370.46 | Sq.m. |
| 5 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level. | 459.26 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054