- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Public Works Department
- >
NTID 42762860
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowUrgent Repairs Of Comba Subway in Margao - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Urgent Repairs Of Comba Subway" in Margao, India.
- Opening Date : Thu 27th November, 2025
- Closing Date : Tue 25th November, 2025
- ₹ 1976898.00
- NTID 42762860
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
39538.00 -
Document Cost
5000.00 -
Estimated Cost
1976898.00
BOQ Items Total Items : 4 | Total Qty : 869
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation for roadway as per drawing and technical specification, in all types of strata comprising any of the material such as soil, silt sand, silt sand, clay, gravel, murrum of all varieties shingles, pebbles all types of conglomerates, laterite rock etc soft rock, ordinary rock or disintegrated rock fissured shattered/ decomposed rock or weathered rock all such material as described under appendix to those specification either in full or in parts as the case may be adopting mechanical means (hydraulic excavator) or any approved method or methods as the case may be convenient or permitted inclusive of chiseling and wedging etc in all conditions such as dry, moist, saturated, submerged, foul condition etc including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides, ramming of bottoms, getting out the excavated soil/rock to be leveled and neatly dressed, pumping and bailing out of water, back filling the excavated earth to the extent required and utilizing the remaining earth locally for road work, barricading, danger lightening, guarding and disposal of excavated earth as directed by the engineer in charge all complete including all leads and lifts and up to depth of excavation as per MoRT&H Specification 301. | 333.00 | cu.m. |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 180.00 | cu.m. |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level | 212.00 | cu.m. |
| 4 | Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, Footings, Bases for columns and mass concrete. | 144.00 | sq.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054