- Home
- >
- Tender
- >
- Lakshadweep Tender
- >
- Department of ANDAMAN LAKSHADWEEP HARBOUR WORKS
- >
NTID 44673682
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowUrgent Maintenance Of Damaged in Lakshadweep - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Urgent Maintenance Of Damaged " in Lakshadweep, India.
ANDAMAN LAKSHADWEEP HARBOUR WORKS
Lakshadweep, Lakshadweep, India
NTID 44673682
- Opening Date : Fri 24th April, 2026
- Closing Date : Thu 23rd April, 2026
- ₹ 18295180.00
- NTID 44673682
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
365904.00 -
Document Cost
Refer Documents -
Estimated Cost
18295180.00
BOQ Items Total Items : 12 | Total Qty : 3274.318
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Retrieval of core stone manually removing from heap by lifting from sea +1.00m to -2.50m by using crane and taking out stone weighing 10 to 3000KG stones conveying to dumping place in the alignment of breaskwater and rearranging as requirede as per the instruction of EIC including cost of all labour charges , cost minor tools, hire charge of crane etc complete (from +3.5m to -2.5m) | 870.41 | MT. |
| 2 | Quarying and Collection of the under mentioned quarry product of approved quality from the quarry at mainland and transportation and dumping the same on the alignment of Breakwater at Kalpeni Island for forming the breakwater as per the direction by the EIC, including cost of Quarrying of various sizes of stone boulders at mainland ,cost of removal of over burden, drilling holes on the roack with jack hammer, loading of explosive into the drill holes, blasting, collection, sorting and staking of the quarry prodects, cost of explosive, hire charges of drill rods, hose pipe, air compressor, bull dozer and other accessories etc, collection and loading the quarry product into ships and transportation to site and dumping / placing in position, cost of the wages of the blasters and all other labours, cost of minor tools, hire charges for all the machineries engaged on this work, all taxes/GST, formalities of government at various loacation etc complete. | ||
| 3 | 10 Kg to 100Kg | 1411.00 | MT. |
| 4 | Loading, conveying and placing of Tetrapod weighing 8 Ton from casting yard to Break Water site and placing the same in two layers in the sea side of Breakwater as per the direction of Engineer - In - Charge including cost of lifting , transportation charges, hire charges of Truck, Hire charges of Crane, cost of POL for operating the crane, cost of crane operator, helper, cost of hire charges and running expenses of truck POL and operator charges, all labour charges , minor tools etc. complete. | ||
| 5 | 8 T Tetrapod | 274.00 | No |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054