ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowUrgent Laying Of 355mm Line Fr in panaji - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Urgent Laying Of 355mm Line Fr" in panaji, India.
NTID 47207070
- Opening Date : Tue 3rd November, 2026
- Closing Date : Mon 2nd November, 2026
- ₹ 18021213.00
- NTID 47207070
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
360425.00 -
Document Cost
10000.00 -
Estimated Cost
18021213.00
BOQ Items Total Items : 52 | Total Qty : 16016.8371
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supplying, of HDPE pipes at store or site of work including loading & unloading stacking, transit insurance etc. Complete bearing ISI mark conforming to IS: 14333 - 1996 and made from PE 100 resin Class IV (6kg/cm2) normal dia in mm h. 355 MM dia | 121 | R.M. |
| 2 | Jointing of HDPE pipes by heating the two ends of the pipe with electrically heated mirror, to the required temperature, including the hire charges of heating mirror and the generator set for the electricity for the heating mirror, etc. complete as per the direction of the engineer in- charge normal Dia in mm 355 mm Dia | 19 | R.M. |
| 3 | Conveying carefully from stack at site, 250m from both sides rolling and lowering in trenches, laying true to line and level and perfect linking for joints for P.V.C / H.D.P.E complete in all respects as per the direction of the engineer in-charge i. 355 mm dia | 110 | R.M. |
| 4 | Cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour , tools etc, and disposing the excavated excess material from the trench to a distance of 1000 meters, including making level the trench surface by utilising the serviciable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer incharge. | 132 | Sq.M. |
| 5 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil Lift 0-1.50m | 98.01 | Cu. M. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054