- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Goa Tourism Development Corporation Limited
- >
NTID 44952993
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowUpgradation Beautification And in panaji - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Upgradation Beautification And" in panaji, India.
- Opening Date : Tue 5th May, 2026
- Closing Date : Mon 4th May, 2026
- ₹ 3335524762.00
- NTID 44952993
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
667110.00 -
Document Cost
15000.00 -
Estimated Cost
3335524762.00
BOQ Items Total Items : 197 | Total Qty : 63136.4
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORKS | ||
| 2 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 3.00 | 100 sq.m |
| 3 | Earth work in excavation over areas of all type strata comprising of all type of strata comprising of any type of material such as soil,silt,clay,sand,gravel,murum of all varieties, shingles, pebbles, all type of congolmerates,latrite rock,soft rock,ordinary rocks,disintegrated rocks,fissued/shattered rocks,decomposed rocks,weathered rocks and all such materials either in full or part as the case may be adopting any method/methods as may be conveninet or permitted ( blasting provibhited ) including chiselling ,wedging,etc , in all conditions such as dry , moist ,foul, saturated , submerged ,etc. , as directed by the Engineer etc., all complete including dressing of side ramming of bottom including all leads and lifts including getting out excaveted soil as directed . including pumping and bailing out water ,baricading,danger lightening ,guarding as directed . | 303.00 | Cu.m |
| 4 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | 543.00 | Cu.m |
| 5 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer. | 646.00 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054