Tender for Haryana Government - NTID 31412861
Haryana Government
Multi city, Haryana, India
NTID 31412861
- Opening Date : Fri 28th April, 2023
- Closing Date : Thu 27th April, 2023
- ₹ 87293239.00
- NTID 31412861
Up Gradation And Commissioning After Conversion Of Existing 6 Mld Capacity Sewage Treatment Plant Based On Moving Bed Biological Reactor Technology (attached Growth Process) To Sbr Process Followed By Chlorination In Existing Stp Complete In All Resp
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1745865.00 -
Document Cost
20000.00 -
Estimated Cost
87293239.00
BOQ Items Total Items : 2 | Total Qty : 2
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction and commissioning of new sewage treatment plant of 6 MLD capacity based on Sequencing Batch Reactors Technology (SBR) (Attached growth process) followed by Chlorination complete in all respect with PLC, data transfer through modem to website and all other works contingent there to including Operation and Maintenance of existing STP /MPS during construction of new STP period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the Construction and commissioning of new sewage treatment plant based on Sequencing Batch Reactors Technology (SBR) i.e completion of tertiary treatment plant at Sohna town District Gurugram. (a) Entire Civil works as per DNIT (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost) | 1 | Job |
2 | Construction and commissioning of new sewage treatment plant of 6 MLD capacity based on Sequencing Batch Reactors Technology (SBR) (Attached growth process) followed by Chlorination complete in all respect with PLC, data transfer through modem to website and all other works contingent there to including Operation and Maintenance of existing STP /MPS during construction of new STP period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the Construction and commissioning of new sewage treatment plant based on Sequencing Batch Reactors Technology (SBR) i.e completion of tertiary treatment plant at Sohna town District Gurugram. (b) Entire mechanical, electric and instrumentation works as per DNIT Mechanical equipment, Electric and instrumentation equipment any other works contingent thereto (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost) | 1 | Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane