- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Aligarh Development Authority
- >
NTID 43827083
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowTransport Nagar Scheme Filling in Aligarh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Transport Nagar Scheme Filling" in Aligarh, India.
Aligarh Development Authority
Aligarh, Uttar Pradesh, India
NTID 43827083
- Opening Date : Sat 14th February, 2026
- Closing Date : Sat 14th February, 2026
- ₹ 12596798.00
- NTID 43827083
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
252000.00 -
Document Cost
22500.00 -
Estimated Cost
12596798.00
BOQ Items Total Items : 21 | Total Qty : 30155.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | EXCAVATION in foundation in ordinary Soil ( Loam, clay or sand ) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer-In-Charge upto a distance of 30 m.from foundation trenches by hydraulic excavator/manual means. For building/drain work only | 299.000 | Cum |
| 2 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work. in Foundation and floors. | 49.000 | cum |
| 3 | Providing & Laying in position specified grade of reinforced cement concrete, with 1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) including the cost of centering, shuttering, finishing and excluding reinforcement . All work upto plinth level | 32.000 | Cum |
| 4 | R C C work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Including the cost of centering shuttering, finishing and excluding reinforcement .1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) upto plinth level | 69.000 | Cum |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 213.000 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054