- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
- >
NTID 43731936
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowTourism Development Work Of Sh in Ghazipur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Tourism Development Work Of Sh" in Ghazipur, India.
UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
Ghazipur, Uttar Pradesh, India
NTID 43731936
- Opening Date : Fri 13th February, 2026
- Closing Date : Fri 13th February, 2026
- ₹ 7453145.00
- NTID 43731936
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
139000.00 -
Document Cost
3540.00 -
Estimated Cost
7453145.00
BOQ Items Total Items : 198 | Total Qty : 11856.01
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 162.31 | CUM |
| 2 | Filling of earth in plinth in 20cm layer including leveling, dressing and watering and also including of supply of earth including carted loading & unloading as per direction of Engineer incharge.. | 70.11 | CUM |
| 3 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | 30.67 | CUM |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 51.55 | CUM |
| 5 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 306.77 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054