- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
- >
NTID 43731984
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowTourism Development Work Of Ra in Ghazipur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Tourism Development Work Of Ra" in Ghazipur, India.
UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
Ghazipur, Uttar Pradesh, India
NTID 43731984
- Opening Date : Fri 13th February, 2026
- Closing Date : Fri 13th February, 2026
- ₹ 3885309.00
- NTID 43731984
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
139000.00 -
Document Cost
3540.00 -
Estimated Cost
3885309.00
BOQ Items Total Items : 103 | Total Qty : 4948.42
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 127.84 | CUM |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 45.07 | CUM |
| 3 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | 143.06 | SQM |
| 4 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 24.23 | CUM |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 6.46 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054