NTID 44363070
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowThis Work Mainly Involves The in Ernakulam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "This Work Mainly Involves The " in Ernakulam, India.
- Opening Date : Mon 30th March, 2026
- Closing Date : Sat 28th March, 2026
- ₹ 3489915.00
- NTID 44363070
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
69800.00 -
Document Cost
Refer Documents -
Estimated Cost
3489915.00
BOQ Items Total Items : 8 | Total Qty : 1888
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation of earth pits of size 0.3x0.3x0.4m in all kinds of soil for fixing MS angle fencing postsat 2m intervals, true to line and level.The posts shall be embedded in cement concrete of mix 1:2:4 (1:cement,2:coarse sand,4:graded stone aggregate). The work includes excavation of earth pits, placing and alligning the posts,concreting, curing and disposal of excavated earth within a lead of 5 km,as directed by the Engineer-in-Charge. ( excluding cost of structurals will be pay separetly) | 70.00 | No |
| 2 | Levelling the existing ground including removing vegetation and undulation not exceeding 30cm deep, consolidating the levelled surface in layers not exceeding 25 cm in depth, breaking clods, watering, rolling, each layer with roller or wooden /steel rammers that a gradual slope is maintained after consolidation to one side of the area for drainage etc. complete. The rate quoted shall be inclusive of cost and conveyance of all labours, materials, equipments, other incidentals etc. complete and disposal of rubbish and vegetation to the designated dumping area within 5Km as instructed by the Engineer-In-Charge. | 1317.00 | Sqm |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53mm to 0.075mm) to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finish in sub base /base course on well prepared surface and compacting with vibratory roller of 8 to 10 Tonne capacity to achieve the desired density, complete as per specifications and direction of Engineer-in-Charge. | 130.00 | Cum |
| 4 | Providing and laying in the ready mix concrete (RMC) of M20 grade using maximum aggregate size of 20mm for the surface bed above WMM layer, with a thickness of 15cm (surface shall be finished smooth & level) manufacured in fully automatic batching plant and transported to the site of work in transit mixer for all leads in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer to site of laying including cost and conveyance of all materials, cost of cement, labour for laying, consolidating by vibration, curing for 28 days, cost of admixtures in reccomended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability etc. as per direction of the Engineer-in-charge . Rate quoted shall be inclusive of cost of all materials, labour, hire charges of tools, machineries, equipments etc. complete. | 185.00 | Cum |
| 5 | Steel reinforcement for R.C.C work including strightening,cutting,bending, placing in position and binding all complete upto plinth level. | 55.00 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054