- Home
- >
- Tender
- >
- Tripura Tender
- >
- Department of Secondary Education
- >
NTID 45985176
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now5th Call For Therepairing Work in South Tripura - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "5th Call For Therepairing Work" in South Tripura, India.
Secondary Education
South Tripura, Tripura, India
NTID 45985176
- Opening Date : Tue 28th July, 2026
- Closing Date : Mon 27th July, 2026
- ₹ 1050000.00
- NTID 45985176
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21000.00 -
Document Cost
1000.00 -
Estimated Cost
1050000.00
BOQ Items Total Items : 28 | Total Qty : 5468.029
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge:- Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.986 | cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 1.986 | cum |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 1.418 | cum |
| 4 | First class brick work in foundation and plinth including cost of all materials as required complete:-cement mortar 1:6 (1 cement :6 fine sand ). | 18.438 | cum |
| 5 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete.In cement mortar 1:5 (1 cement :5 fine sand ). | 3.938 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054