- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of CHENNAI PORT TRUST
- >
NTID 42682896
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowTender For Renovation Of Kitch in Chennai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Tender For Renovation Of Kitch" in Chennai, India.
CHENNAI PORT TRUST
Chennai, Tamil Nadu, India
NTID 42682896
- Opening Date : Tue 2nd December, 2025
- Closing Date : Mon 1st December, 2025
- ₹ 14234012.00
- NTID 42682896
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
285000.00 -
Document Cost
Refer Documents -
Estimated Cost
14234012.00
BOQ Items Total Items : 79 | Total Qty : 43860
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Schedule A - Modular Kitchen 1. Supplying and fixing semi modular kitchen arrangements such as Bottom Cabinets, wall box cabinees, Cupboard shutters, loft shutter, Magic corner etc.,made of Prelam Hydrogaurd Plus- High Density Fiber with accessories at Ramanujam Quarters 3 including all materials, labour, tools , accessories, fuel etc., complete as per drawing and as described in Part II -C of sec4. Note: 1. The term "UNIT" shall be taken as one individual residentail house 2.Payment will be made for each unit on completion of all works as Specified | 6.00 | UNIT (One unit only) |
| 2 | 2. Supplying and fixing semi modular kitchen arrangements such as Bottom Cabinets, wall box cabinees, Cupboard shutters, loft shutter, Magic corner etc.,made of Prelam Hydrogaurd Plus- High Density Fiber with accessories at Ramanujam Quarters 1 including all materials, labour, tools , accessories, fuel etc., complete as per drawing and as described in Part II -C of sec4. Note: 1. The term "Unit" shall be taken as one individual residential house. 2. Payment will be made for each unit on completion of all works as specified | 6.00 | UNIT (One unit only) |
| 3 | Schedule B- Civil maintenance 3. Providing double scaffolding arrangements for attending repair / improvement works by using steel pipes of required diameter or by Casuarina poles, including providing necessary Horizontal and vertical members, tie members, bracings etc., all round and platforms at various level adquate strength including removing the scaffolding with platform after completion of repair/improvement works all as per relevant specification and all as directed at site including all labour, materials, tools, equipments, coir, transport, fuel, etc., complete. Note:1) Scaffolding will be measured only one time for entire repair /improvements (length x height.) 2)75% of the payment may be released after erecting of scaffolding in all respects. 3)25% of the balance payment will be released only after completion of repair/improvement works and removal ofscaffolding. 4) If casuarina poles used for scaffolding, the bottom and top dia ofcasuarina poles are of 100mm and 50mm respectively | 700.00 | 1M2 (One square metre) |
| 4 | 4. Cutting and removing the Fallen/Dead/unwanted trees of the girth Beyond 30cm girth upto and including 60cm girth, tree branches on the compound wall/building or wherever required and as directed at site by using cutting machine/ manual into different cut pieces for easy handling, removing the all cut pieces and leaves etc., without damaging the near by strtucture and including collecting, transporting and dumping the same wherever required all as directed at site of work including all labour, tools, tackles, equipments, fuel, transport, scaffolding, etc. Complete. Note : For payment purpose the actual number of trees will be taken into account irrespective of its branches. | 40.00 | 1No. (One Number) |
| 5 | 5. Dismantling and removing the existing damaged GI/PVC rainwater /sewer pipe above Ground Level without damaging the nearby structures, wherever required and transporting and handing over the serviceable materials to the departmental stores/RSO yard and stacking the debris if any within a lead of 50m for disposal all as per relevant specification and as directed at site including all labour, scaffolding, tools, equipments, transport, fuel etc.,complete | 500.00 | 1Rm (One Running metre) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054