Tender for Airports Authority of India - NTID 29925083
Airports Authority of India
Shillong, Meghalaya, India
NTID 29925083
- Opening Date : Mon 26th December, 2022
- Closing Date : Fri 23rd December, 2022
- ₹ 6669744.00
- NTID 29925083
Supply, Installation, Testing And Commissioning Of Elevators At Technical Block And Transit Accommodation At Shillong Airport, Barapani
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
133395.00 -
Document Cost
1180.00 -
Estimated Cost
6669744.00
BOQ Items Total Items : 12 | Total Qty : 18
# | Item | Quantity | Units |
---|---|---|---|
1 | Supplying, installation, testing and commissioning of 6 Passenger (408 kg) lift (Gearless Machine room less) having speed of 1 meter per sec. serving different floors in the lift shaft as per following floors to be served and complete as required as mentioned below and in the technical specifications. Power - 415 V, 3 Phase, 50 Hz, AC Speed - 1.00 MPS Machine - Gearless machine with permanent magnet synchronous motor (Directly placed above hoist way) Control - Microprocessor based Variable Voltage Variable Frequency ARD System Car Enclosure - SS Cabin Hair line finish with Glass Door in cabin (2/3 height glass door) Door Operation - Power Operated Automatic (a). Floors to be served - Ground + 3 Travel - 09.1 Meters (approx.) Stops & Opening - Four ( G + 3 ) on same side | 2.00 | Each |
2 | Supplying, installation, testing and commissioning of 6 Passenger (408 kg) lift (Gearless Machine room less) having speed of 1 meter per sec. serving different floors in the lift shaft as per following floors to be served and complete as required as mentioned below and in the technical specifications. Power - 415 V, 3 Phase, 50 Hz, AC Speed - 1.00 MPS Machine - Gearless machine with permanent magnet synchronous motor (Directly placed above hoist way) Control - Microprocessor based Variable Voltage Variable Frequency ARD System Car Enclosure - SS Cabin Hair line finish with Glass Door in cabin (2/3 height glass door) Door Operation - Power Operated Automatic (b). Floors to be served - Ground + 5 Travel - 16 Meters (approx.) Stops & Opening - Six ( G + 5 ) on same side | 1.00 | Each |
3 | All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (a). First Year after Completion of DLP (Considered rate 5% of SITC Cost of item No. 01) | 2.00 | Per Year |
4 | All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (b). Second Year (Considered Yearly rate 10% cumulative enhancement on 1st year AICMC cost. | 2.00 | Per Year |
5 | All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (c). Third Year (Considered Yearly rate 10% cumulative enhancement on 2nd year ALCMC cost. | 2.00 | Per Year |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane