Tender for Public Works Department - NTID 29963208
Public Works Department
Sealdah, West Bengal, India
NTID 29963208
- Opening Date : Tue 24th January, 2023
- Closing Date : Fri 20th January, 2023
- ₹ 0.00
- NTID 29963208
Supply, Installation, Testing and Commissioning Of Ups With Related Electrical Installation Works At Different Places At Ipgaer At Shyamadas Vaidya Sasthra Pith Hospital
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
12000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 25 | Total Qty : 339
# | Item | Quantity | Units |
---|---|---|---|
1 | SITC of 5KVA True Online Double Conversion IGBT based UPS system with Advanced DSP based Technology having minimum output power factor 0.8 with 240V Single phase input & 240V single phase output and following minimum accessories at suitable size platform. a) in built/ External isolation Transformer with cabinet at input side. b) Paralelling kit. c) Modbus TCP/IP card c) Suitable size Battery MS rack (Making M.S. Grill cover all around the UPS Set having size 1.5(H)x 1(W) x 2 mtrs(H) with M.S. Sqr. Bar. Grill cover must be openable from all sides for further maintenance). d) Total minimum 8064 VAH SMF battery for each UPS to provide 60mins. Battery backup at Full load. Make : Amararaja Quanta / Exide Power Safe [ VERTIV make Liebert ITA 2 5 KVA/ APC / Delta/AVO] | 2 | No. |
2 | Terms and Condition | ||
3 | The Agency must procure the materials from the Manufacturer / OEM or from their authorised sales channel so that the standard warranty / support of the Manufacturer / OEM becomes applicable to the products to be delivered and installed by them. | ||
4 | Documents that authenticates such procurement from the Manufacturer / OEM or from their authorized sales channel and standard warranty / support should be sent from the e-mail of the Manufacturer / OEM / authorized sales channel to the e-mail of Engineer-in-Charge and hard copy of it to be submitted during execution, of work/submission of bill. | ||
5 | If any refurbished material is supplied and installed, penal action will be taken as per existing rules |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane