- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH
- >
NTID 44590807
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowSupply Installation Testing in Parganas - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Supply Installation Testing " in Parganas, India.
COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH
Parganas, West Bengal, India
NTID 44590807
- Opening Date : Thu 30th April, 2026
- Closing Date : Wed 29th April, 2026
- ₹ 7940161.00
- NTID 44590807
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
158803.00 -
Document Cost
Refer Documents -
Estimated Cost
7940161.00
BOQ Items Total Items : 27 | Total Qty : 31
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Civil and Structural works : | ||
| 2 | 1) Modification of the existing HVAC system as per the existing site condition to maintain design parammeter.This job includes necessary modification of ductwork, piping, electrical connections, and structural supports. All dismantled materials and debris to be removed and disposed as per instruction by the Engineering in-charge. Site preparation work including levelling, excavation, and backfilling as required for new installations. Construction of new foundations and structural supports for HVAC system and other electro-mechanical systems. All civil and structural works to be executed in accordance with the relevant drawing and specification duly approved by concerned Engineering in-charge. Construction of a new shed to house mechanical equipment. The scope includes roofing, cladding, supporting steel structures, and all necessary civil and structural works. Construction of a dedicated electrical room to accommodate the new MCC panel. Includes all required civil works (walls, roofing, flooring), structural framing, electrical provisions, lighting, ventilation etc. as required as per the site requirement 2) Upgradation of clean room system to keep provision for dedicated air lock room at the main entry corridor area. Air lock room should have minimum difference 5 Pa positive air pressure compare to the dirty corridor and entry corridor. 2.01) Supply, Installation, Testing and Commissioning of Double skin Clean room Wall Cladding, Wall Partition Panel system 80 mm thick , PUF infilled powder coated GI sheet, as per specification complete with concealed conduits for power socket, data, telephone points and necessary factory finished cut-outs for double gazed view panels and doors. Double skin sandwich type GSS/CRCA Powder coated Metallic ceiling panels of 0.6 mm thickness on both sides, PUF in-filled with 40+/-2 Kg/m3 density insulation. Complete with Extruded aluminium powder coated supports and hanging arrangement, with aluminium profiles that create uniform seams. The Partition seams are sealed by RTV silicone with a perfectly flush finishing. PUF insulation material is sandwiched between the two skin layers and sealed from the exterior by the GI frame work including all cut-outs factory fitted, for Air terminals/Diffusers and lighting etc. including necessary utility cut-outs duly concealed, as per specification, including necessary utility factory finished cut-outs duly concealed as per specification 3) Supply, Installation, Testing and Commissioning of Clean room compatible Single Leaf Doors 1200 (W)x2100mm (H) as per specification with door closure, SS-'D' handle, Push plate and kick plate along with 480x750 double glazing view panel & Drop-seal 4) Supply, Installation, Testing and Commissioning 2-Door Interlock system with Electromagnetic Strike lock unit and Egress Button for air lock for entry gate and dirty corridor gate | 1.00 | Lot |
| 3 | AC works : Modular Outdoor TFA Double skin Air Handling Units of 43+/- 2 mm thick PUF injected panels with 24 gauge GI inner skin and pre-coated GI outer skin all as per specification including fan with TEFC motor. AHU shall have Air intake louver combined with pre filter (EU-3), Fine Filter section (EU-9), HEPA filter section (EU-13), coil section with DX 6-Row coil, blower section with DIDW (double inlet double width) centrifugal fan having static pressure of 140 mm/Wg with TWIN MOTOR ARRANGEMENT (1S +1W). The AHU complete in single/double tier construction with Thermal break profile having various sections like Aluminium Fresh air louver section with louver, filter section, fan section, coil section and supply air plenum etc. The AHU having TEFC (totally enclosed Fan Cooled) motor with VFD, Cooling & heating coil, moisture eliminator. AHU should be designed for maximum 2.5m/s face velocity on filters & coils and sections having filters should be provided with necessary port for measuring pressure differential with the help of magnehelic gauge mounted over the AHU itself for regular maintenance of filters. AHU should be provided service windows of suitable width for maintenance of various sections and inspection windows should be provided glass panels for viewing inside the AHU. AHU panel thickness should be 43+/-2mm injected with PUF and sheet thickness should be 22/24. Drain pan of all the AHUs should be dully insulated and material of construction should be 1 mm SS304. Additional safety accessories like Cushy foot mountings, Limits switches for access doors, inspection lamp, Fire proof double canvass connections (Fungal resistant and Lint free) should also be provided along with AHU. | ||
| 4 | AHU - 1 (New) : Supply, Installation, Testing and Commissioning of TFA type 100% FA Unit with 140 mm WG Static pressure - for following rooms : i) Breeding Room comprising of 3 ventilator suitable for 6 rack ii) Mice Room-1 comprising of 5 ventilator suitable for 8 rack iii) Mice Room - 2 comprising of 3 ventilator suitable for 5 rack. (necessary upgradation of the said rooms air circulation to be considered in this unit)) AHU - 2 (New) : Supply, Installation, Testing and Commissioning of TFA type 100% FA Unit with 140 mmWG Static pressure - for following rooms i) Animal Experimentation Room comprising of 2 ventilator suitable for 4 rack ii) Office Room to maintain desired room temperature and RH iii) IN-VIVO Room to maintain desired room temperature and RH iii) Necropsy Room to maintain desired room temperature and RH (Necessary upgradation of the said rooms air circulation to be considered in this unit) | 1.00 | Lot |
| 5 | Modification, upgradation of the existing AHU-3 ducting system for the Quarantine Room's air circulation as required design parameter considering two (2) ventilator | 1.00 | Lot |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054