Supply Carting Laying Jointing Of Di K9 Pipe For Rising Main And Gim Pipe In Distribution And Construction Of Pump House1 No Oht Of 50 Kl1 No 17m Staging And Boundary Wall With All Fittings And Appurtenant Works
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
128000.00 -
Document Cost
4720.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 36 | Total Qty : 7502.63
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply of all Materials , Labours ,T&P etc. and Construction of RCC O.H.T of following capacities (In Kiloliters) and 17m. Staging with 1.00m wide RCC staircase from G.L. to balcony and from balcony to Top Dome 1m x 1m RCC landing at suitable locations and railed with 3 rows of 20mm dia. G.I. (M) pipe on 65x65x5mm angle iron posts fixed with ladder, top to the floor inside of the tank. M.S. M.H. cover with locking arrangement, lightening conductor as per electricity rules, water level indicator, supply and fixing of outlet, inlet, overflow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body, vertical pipe, ladder M.S M.H. cover , ventilator column etc. Complete with approved water proofing ( apex)/ enamal paint, testing, filling water for testing purpose etc. including supply of verticle pipes and specials assuming bearing capacity as 8MT/M2 | ||
2 | RCC OHT 50 KL capacity staging 17.00 meter. | 1.000 | No. |
3 | Providing of all materials , carting from site store to site of work, lowering into trenches with true to alignment , Laying & Jointing of full lenght S&S Centrifugally cast (spun) Ductile iron pipes including supply of "EPDM " rubber gaskets conforming to IS : 5382/1985 with testing of pipe line complete. | ||
4 | DI K9 Pipe 100 mm Dia | 32.000 | M. |
5 | Excavation of earth for pipe line in trenches following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60m from trenches including supply of labour, T&P etc complete. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane