- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Public Works Department
- >
NTID 44967656
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowStrengthening Of Alternate Roa in Bicholim - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Strengthening Of Alternate Roa" in Bicholim, India.
- Opening Date : Wed 29th April, 2026
- Closing Date : Mon 27th April, 2026
- ₹ 3969723.00
- NTID 44967656
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
79395.00 -
Document Cost
6000.00 -
Estimated Cost
3969723.00
BOQ Items Total Items : 10 | Total Qty : 13688.14
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001). | 7400.00 | sqm |
| 2 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per MORTH Specification 301 | 412.50 | Cum |
| 3 | Spreading the earth/hard soil in layers not exceeding 250 mm in depth breaking clods, watering rolling each layer with half ton roller or wooden or steel hammers and rolling every third and topmost layer with power toller of minimum 8 tonne and dressing up in embankment for roads, flood banks, marginal and guide banks and filling up of ground dressing etc. complete. | 3135.00 | Cum |
| 4 | Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and confirming to IRC-79 and the drawings.) | 420.00 | Each |
| 5 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m; All kinds of soil | 270.64 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054