- Home
- >
- Tender
- >
- Bihar Tender
- >
- Department of HPCL Biofuels Limited
- >
NTID 47090652
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowStanding Order For Carrying Ou in West Champaran - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Standing Order For Carrying Ou" in West Champaran, India.
HPCL Biofuels Limited
West Champaran, Bihar, India
NTID 47090652
- Opening Date : Sat 24th October, 2026
- Closing Date : Fri 23rd October, 2026
- ₹ 0.00
- NTID 47090652
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
70000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 101 | Total Qty : 101
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | EXCAVATION IN EARTH UPTO 1.5 M: Excavation for foundation upto required depth below existing ground level up to 1.5 m. depth in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | 1 | M3 |
| 2 | EXCAVATION - 1.5 TO 3 M: Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH BETWEEN 1.5 TO 3 M | 1 | M3 |
| 3 | EARTH FILLING: Supply and filling imported earth of approved quality in layers not exceeding compacted thickness of 200mm incl. Watering ,ramming, compacting, and if required, rolling and re-rolling with power roller , mechanical compactors of 80KN- 100 KN capacity to achieve maximum compaction, all complete as per direction of Engg.-In-Charge. The earth should be free from weeds, grass and other objectionable debris. Black Cotton soil shouldn't be used. Measurement basis compacted thickness only. Rate shall include conducting compaction test as per tech spect. | 1 | M3 |
| 4 | PCC 1:4:8:Providing and laying PCC 1:4:8 using 40 mm and down size graded stone aggregates including machine mixing, providing formwork if required, placing, compacting by hand ramming , curing etc complete. | 1 | M3 |
| 5 | PCC 1:3:6: Providing and laying PCC 1:3:6 using 20 mm and down size graded stone aggregates including machine mixing, providing formwork if required, placing, compacting by hand ramming, curing etc complete. | 1 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054