Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Srmo Strengthening Of Over He" in Baddi, India.
The Himachal Pradesh State Industrial Development Corporation Limited
Baddi, Himachal Pradesh, India
NTID 43220537
- Opening Date : Sat 27th December, 2025
- Closing Date : Fri 26th December, 2025
- ₹ 566984.00
- NTID 43220537
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 8 | Total Qty : 2952.23
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, upto all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads. All kinds of soil and as per direction of Engineer-in-Charge. | 10.13 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) and as per direction of Engineer-in-Charge. | 1.35 | Cum |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form and as per direction of Engineer-in-Charge. for : (a) Foundations, footings, bases of columns, etc. for mass concrete | 8.10 | SqM |
| 4 | (b) Columns, Pillars, Piers, Abutments, Posts and Struts. | 273.60 | SqM |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) and as per direction of Engineer-in-Charge. | 2.73 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054