Inquiry NowSpecial Repairs Replacement Ag in Rajouri - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Special Repairs Replacement Ag" in Rajouri, India.
Military Engineer Services
Rajouri, Jammu and Kashmir, India
NTID 44694863
- Opening Date : Thu 23rd April, 2026
- Closing Date : Mon 20th April, 2026
- ₹ 4459442.00
- NTID 44694863
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
89200.00 -
Document Cost
500.00 -
Estimated Cost
4459442.00
BOQ Items Total Items : 13 | Total Qty : 410
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supply, install ,testing and commissioning of distribution transformer stepdown 11 KV/0.433 KV three phase complying with IS : 1180(PT-I) 2014 with latest ammendments outdoor type double copper wound suitable for 50 HZ system of capacity 63 KVA ,oil immersed naturally cooled delta connected on HT side and star connected on LT side ,vector group Dyn II, provided with off load tap changer to vary secondary voltage from -7.5% to +7.5 % in step of 2.5 % losses should be confirmed to the limits specified as follows maximum allowable losses at full load (100%) & half load (50%) shall not be exceeded 0.98% & 0.70% ,percentage impedence 5 % losses and impedance are subjected to tolerance as specified in IS 1180. The transformer shall be supplied with first filling of oil confirming to IS 335. The transformer shall have both side cable end box with neutral brought out complete all as directed by Engr-in-charge and installation of transformer shall be carried out as per IS 10028 and comprising with the following standard fittings/technical specification:- | 6.00 | Each |
| 2 | (a) lifting lug for transformers and tank. (b) Earthing terminal rating and diagram plate. (c ) Air release device (d) Oil filling inlet pipe with plug (e) Drain outlet pipe with brass gate valve. (f) conservator tank with oil level indicator. (g) Silica gel breather. (h) first fill of oil upto level including conservator tank with fresh new oil confirming to IS 335. (j) Type of connection delta/star. (k) Type of cooling : Oil and natural air. (l) Vector group : Dyn -II. (m) Temperature rise over an ambient of 50 degree C. (n) Cable end box on both side for HT/LT cables of suitable size. (o) provision of thermometer with pocket. (p) Provision of oil and winding temperature gauge. Note:- Tests after installation shall also be carried out by SEI for which GE will intimate through proper channel. | ||
| 3 | Supply, install ,testing and commissioning of distribution transformer stepdown 11 KV/0.433 KV three phase complying with IS : 1180(PT-I) 2014 with latest ammendments outdoor type double copper wound suitable for 50 HZ system of capacity 100 KVA, oil immersed naturally cooled delta connected on HT side and star connected on LT side ,vector group Dyn II, provided with off load tap changer to vary secondary voltage from -7.5% to +7.5 % in step of 2.5 % losses should be confirmed to the limits specified as follows maximum allowable losses at full load (100%) & half load (50%) shall not be exceeded 0.98% & 0.70% ,percentage impedence 5 % losses and impedance are subjected to tolerance as specified in IS 1180. The transformer shall be supplied with first filling of oil confirming to IS 335. The transformer shall have both side cable end box with neutral brought out complete all as directed by Engr-in-charge and installation of transformer shall be carried out as per IS 10028 and comprising with the following standard fittings/technical specification:- | 4.00 | Each |
| 4 | (a) lifting lug for transformers and tank. (b) Earthing terminal rating and diagram plate. (c ) Air release device. (d) Oil filling inlet pipe with plug. (e) Drain outlet pipe with brass gate valve. (f) conservator tank with oil level indicator. (g) Silica gel breather. (h) first fill of oil upto level including conservator tank with fresh new oil confirming to IS 335. (j) Type of connection delta/star. (k) Type of cooling : Oil and natural air. (l) Vector group : Dyn -II. (m) Temperature rise over an ambient of 50 degree C. (n) Cable end box on both side for HT/LT cables of suitable size. (o) provision of thermometer with pocket. (p) Provision of oil and winding temperature gauge. Note:- Tests after installation shall also be carried out by SEI for which GE will intimate through proper channel. | ||
| 5 | S & F storage water heater (geyser) 5 star rated as per BEE norms electrically operated suitable for 230 volts, 50 hz, AC supply system complete with glass coated insulated heating element tank of capacity 25 litre, complete with all accessories such as safety valve, thermostat, NRV,connecting hose-02 Nos hot and cold water, complete all as specified & directed. | 19.00 | Each |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054