Inquiry NowSpecial Repair To Presidential in MHOW - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Special Repair To Presidential" in MHOW, India.
Military Engineer Services
MHOW, Madhya Pradesh, India
NTID 44548581
- Opening Date : Mon 13th April, 2026
- Closing Date : Fri 10th April, 2026
- ₹ 6796000.00
- NTID 44548581
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
127000.00 -
Document Cost
1000.00 -
Estimated Cost
6796000.00
BOQ Items Total Items : 17 | Total Qty : 3359.97
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | M&L for Repair to pot holes any depth, not exc 1 sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads, paths, etc cutting around edges to at least 25mm in depth, and making good by applying tack coat @ 5 Kgs per 10 Sqm and laying premixed bituminious macadam well rammed and sealed with paving bitumen 60/70 or VG-30 grade@ 9.8 Kgs per 10 Sqm, blinded with 0.09 Cum of stone chipping of size 6.3mm and again well rolled with 8 to 10 tonne power roller (Iincluding supply of pre-mixed macadam, binder and chipping) depth of pot holes exc 30mm complete all as specified and directed. | 1.00 | Per Ten Sqm |
| 2 | M&L for preparation of surfaces of existing black top surface or bituminous macadam surfaces by brushing with wire brushes for removing caked mud etc and sweeping with brooms and finally fanning to clean the surfaces with gunny bags to remove all loose dirt etc on black top/concrete surfaces and applying evenly a priming tack coat with bitumenous primer using paving bitumen at the rate of 5 kg / 10 sqm and applying premixed hot mix Asphaltic Semi Dence Concrete using 5.5% binder content (VG-30 Grade paving bitumen) by weight of total mix and with thickness of 30 mm (consolidated Thickness) including rolling with 8 to 10 tonne power road roller to uniform and smooth surface and consolidation to required gradient and camber all as specified and directed. | 1393.64 | Per Ten Sqm |
| 3 | Note1 : (a) Cement shall be used as filler at mininum 2% by weight of total mix in event of variation in design mix the percentage of filler content shall be on plus side adopted. (b)SDAC shall be as per MORTH specification Note2: - (i) Laying shall be done by means of self-propelled mechanical paver, and screed temp minimum maintain not less than 140 degree cellicious finishing with electronic sensor and hydraulic controls with suitable speed 5 Km /hour and capable of laying, spreading, tamping and finishing. (ii) Mix shall be obtained from computerized hot mix plant and spreading shall be done by using mechanical paver only) (iii) The mix shall be designed by job mix formula and approved by GE. (iv) Cost of testing charges, materials and transportation etc for job mix formula and Independent testing during execution of work shall be inclusive in the unit rate quoted and no extra payment shall be made on this account. (v) Minimum bitumen content as mentioned in above item, if there is any variation in the actual binder content used, the rate shall be adjusted @ Rs. 50 /- per Kg of binder used. However no price adjustment shall be made if the binder content works out to more than 5.5% as specified in BOQ. (vi) Prior to the execution of work started the Design mix of bituminous permix semi dense asphaltic concrete should be provide by the contractor from any Governement Engineering College or approved NABL lab and job mix should be approved by GE. (vii) Filler material for semi dense asphaltic concrete shall be cement only. (viii) The cost of Job mix & Lab/Feild Testing asper SSR/IS/MORTH as required shall be borne by the contractor. (ix) The hot mix plant should be approved from GE. | ||
| 4 | M&L for premix bituminous macadam (consolidated thickness not more than 75 mm) with 4% binder content of paving bitumen of grade (VG-30) by weight of total mix laid and rolled with 8-10 tonne power roller to required gradient and camber up to outer edges of roads on existing black top surfaces complete all as specified and directed. | 206.52 | Cum |
| 5 | Notes:- (a) Aggregate used in the work shall be obtained from approved source . (b) Minimum content of Cement filler shall be 2% by weight of total mix and dossage shall be as per design mix. No price adjustment shall be applicable if excess quantity of filler is used/approved due to design requirement in the execution of work under this item (c) No price adjustment shall be made for any extra quantity of binder due to design requirement. (d).Cost of testing charges as per (IS),Preparation of moulds,penetration test, Viscosity test,Bitumin extraction test ,, Marshall stability test not less than 1200kg using hot mix plant, spread, rolled and consolidated to required gradient and camber using mechanical sensor paver and roller of type & capacity all as specified in MoRTH and TI 09/2009 . core cutting, materials and transpotation etc for job mix formula shall deem to be included in quoted rate) . (e) Mix shall be from hot mix plant and laying shall be done with mechanical paver. (f) During the laying minimm 02 x water browser shall be available at site . |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054