- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Military Engineer Services
- >
NTID 44816362
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Special Repair in Fatehgadh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Special Repair " in Fatehgadh, India.
Military Engineer Services
Fatehgadh, Uttar Pradesh, India
NTID 44816362
- Opening Date : Thu 14th May, 2026
- Closing Date : Thu 7th May, 2026
- ₹ 14063000.00
- NTID 44816362
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
215630.00 -
Document Cost
1000.00 -
Estimated Cost
14063000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
BOQ Items Total Items : 17 | Total Qty : 1018
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supply, installation commissioning and testing of copper wound transformer step down, outdoor type complete with first filling of IS:335 ISI marked filtered & dehydrated transformer oil and another standard fittings/accessories HT 33 KV, secondary 11 KV, 3 phase, all as per IS: 2026 of capacity 2000 KVA and following item included- (a) 17 position on load tap changer (OLTC) (tapping range +5% to -15% in steps of 1.25 % each) with remote tap cubical changer (RTCC) panel & automatic voltage regulator (AVR) with Vector group Dyn-11, with standard fittings - 01 set (b) HV bare bushing (c) LV cable box (without glands) (d) Buchholz relay (having contacts for Alarm & trip) (e) Oil temperature indicator (having contacts for Alarm & trip) (f) Winding temperature indicator (having contacts for Alarm & trip) (g) Marshalling box (having TTB only ) (k) Air release plug complete all as specified and directed. The following standard fittings/accessories are included as- | 2.00 | Each Job |
| 2 | (a) Fitting alonwith Transformer 01. NAME, RATING & DIAGRAM PLATE 1 No. 02. EARTHING TERMINALS - 2 Nos. 03. LIFTING LUGS - 02 Nos. 04. OIL LEVEL INDICATOR (FLUSH TUBE) - 1No. 05. OIL DRAIN VALVE WITH PLUG - 01 No. 06. OIL FILTER VALVE WITH PLUG (on & above 160 KVA) - 1 No. 07. CONSERVATOR WITH OIL FILLING HOLE WITH CAP -1 No. 08. THERMOMETER POCKET - 1 No. 09. OIL TEMPERATURE INDICATOR (HAVING CONTRACT FORM ALARM & TRIP) -01 No. 10. WINDING TEMPERATURE INDICATOR (HAVING CONTRACT FOR ALARM & TRIP) - 1 No. 11. SILICAGEL BREATHER - 1 No. 12. REMOVABLE INSPECTION OPENING ON TOP COVER - 1 No. 13. EXPLOSION VENT (If PRV Not Opted) - 1 No. 14. BIDIRECTIONAL C.I. ROLLERS - 4 Nos. 15. ARCHING HORN SET (Only for HV Bare Bushing Type Transformer) - 3 Nos. | ||
| 3 | (b) Fittings alongwith OLTC- 01. NAME, RATING & DIAGRAM PLATE -1 No. 02.ON LOAD TAP CHANGER (OLTC) - 1 No. 03. EARTHING TERMINAL- 2 Nos. 04. LIFTING EYE BOLTS - 3 Nos. 05. AIR RELEASE PLUG - 1 No. 06. WINDOW FOR TAP NUMBER - 1 No. 07. OIL DRAIN CUM FILTERING VALVE WITH PLUG -1 No. 08. OIL FILLING CUM FILTERING VALVE WITH PLUG - 1 No. 09. CONSERVATOR WITH OIL FILLING HOLE WITH CAP- 1 No. 10. SILICAGEL BREATHER - 1 No. 11. REMOVABLE MANUAL CRANK HANDLE TO OPERATE OLTC - 1 No. 12. REMOVABLE INSPECTION OPENING WITH COVER - 1 No. 13. OIL SUREGE RELAY - 1 No. Note :- (i) Stand by transformer will be provided by the contractor within 24 hour of failure by his own arrangement to regularize the electric supply. Cost of transportation, replacement, refixing, rent charges and necessary operrational requirements for stand by transformer are deemed to be inclusive of quoted rates by the contractor. No extra will be paid to contractor to make such stand by arrangements. (ii) The contractor alongwith OEM must ensure the serviceability of the tripping system and safety for the transformer before installation. (iii) Stand by transformer will be provided by the contractor within 24 hour of failure by his own arrangement (iv) If the contractor failed to provide standby transformer, then recovery of Rs.30000.00 per day and max of Rs.200000.00 for one month. (v) Old Transformer will be dismantelled / taken down and will be deposit to MES yard cost of same shall be deemed to inclusive of quoted rates | ||
| 4 | M&Lfor Traditional earthing Boring 70 Ft GI Pipe 50 mm 70 Ft GI Clamp and salt charcoal complete earthing. Note : GI Pipe and earth strip will be measured and paid separately | 6.00 | Each Job |
| 5 | Supply and lowering including welding with each other 50 mm dia bore tubes medium grade galvanised with all fttings complete all as specified and directed. | 151.00 | RM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054