- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Department Of Water Resources
- >
NTID 47065893
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Nowsl No 2 Improvement To Badam in Kendrapara - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for " sl No 2 Improvement To Badam" in Kendrapara, India.
Department Of Water Resources
Kendrapara, Odisha, India
NTID 47065893
- Opening Date : Fri 23rd October, 2026
- Closing Date : Thu 22nd October, 2026
- ₹ 634010.00
- NTID 47065893
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 7 | Total Qty : 8206.144
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of Drain by mechanicals means in all kinds of soil including stony earth gravel, morum etc. inter spared with boulders up to 0.50 cum size with all lifts, delfts including trimming the bed and slopes the drain and depositing the excavated material to spoil band including labelling and rough dressing etc. (Bed width within 08 m) | 7897.36 | One Cum. |
| 2 | Excavation of foundation in ordinary soil including dressing and levelling the bed of foundation and disposal of excavated materials within initial lead of 50 M with one extra lift over initial lift of 1.5 M including bailing out water as per the direction of the Engineer-in-charge. | 90.6 | One Cum. |
| 3 | Cement Concrete M-15 (1:2:4) with 40 mm down graded crusher broken hard granite chips including mixing with concrete mixer, hoisting and laying manually, compacting by vibrator including cost, conveyance, royalty of all materials complete including watering, curing including cost of hoisting and laying complete as per direction of Engineer-in-charge. | 46.304 | One Cum. |
| 4 | Filling foundation /plinth with sand including watering & ramming including cost, conveyances and royality of all materials complete as per direction of Engineer-in-charge. | 11.04 | One Cum. |
| 5 | Filling foundation and plinth with excavated materials including watering and ramming including cost, conveyance & royality of all materials complete. as directed by the Engineer-in-charge. | 30.2 | One Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054