- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Indian Institute of Technology Mandi
- >
NTID 46424389
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowServicing And Maintenance Of A in Mandi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Servicing And Maintenance Of A" in Mandi, India.
Indian Institute of Technology Mandi
Mandi, Himachal Pradesh, India
NTID 46424389
- Opening Date : Fri 11th September, 2026
- Closing Date : Wed 9th September, 2026
- ₹ 480121.00
- NTID 46424389
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 6 | Total Qty : 318
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing comprehensive cleaning and servicing of Air Handling Unit (AHU)/ Fan Coil Units of up to 200 CFM ( Heating Only) including opening of access panels, thorough cleaning of cooling/heating coils using approved HVAC coil cleaning chemicals, removal of accumulated dust, dirt and debris from coil fins, cleaning of drain tray, condensate drain line, filters, blower/impeller, motor exterior and internal AHU casing, checking of belts, bearings, dampers, electrical connections and other AHU components for proper functioning, reassembly of all components after cleaning, testing and commissioning of AHU after servicing, and submission of inspection report indicating any defects, repairs or replacements required. The scope shall include all labour, tools, coil cleaning chemical, transportation and safety equipment complete as required and as directed by Engineer-in-Charge. No spare parts is included in this item. | 124 | Each |
| 2 | Providing comprehensive cleaning and servicing of Air Handling Unit (AHU)/ Fan Coil Units of above 200 CFM to 800 CFM ( heating / cooling ) including opening of access panels, thorough cleaning of cooling/heating coils using approved HVAC coil cleaning chemicals, removal of accumulated dust, dirt and debris from coil fins, cleaning of drain tray, condensate drain line, filters, blower/impeller, motor exterior and internal AHU casing, checking of belts, bearings, dampers, electrical connections and other AHU components for proper functioning, reassembly of all components after cleaning, testing and commissioning of AHU after servicing, and submission of inspection report indicating any defects, repairs or replacements required. The scope shall include all labour, tools, coil cleaning chemical, transportation and safety equipment complete as required and as directed by Engineer-in-Charge. No spare parts is included in this item. | 11 | Each |
| 3 | Providing comprehensive cleaning and servicing of Air Handling Unit (AHU)/ Fan Coil Units of above 800 to 4000 CFM (both heating & cooling ) including opening of access panels, thorough cleaning of cooling/heating coils using approved HVAC coil cleaning chemicals, removal of accumulated dust, dirt and debris from coil fins, cleaning of drain tray, condensate drain line, filters, blower/impeller, motor exterior and internal AHU casing, checking of belts, bearings, dampers, electrical connections and other AHU components for proper functioning, reassembly of all components after cleaning, testing and commissioning of AHU after servicing, and submission of inspection report indicating any defects, repairs or replacements required. The scope shall include all labour, tools, coil cleaning chemical, transportation and safety equipment complete as required and as directed by Engineer-in-Charge. No spare parts is included in this item. | 17 | Each |
| 4 | Providing comprehensive cleaning and servicing of Air Handling Unit (AHU) Units of above 4000 to 6900 CFM (both heating & cooling ) including opening of access panels, thorough cleaning of cooling/heating coils using approved HVAC coil cleaning chemicals, removal of accumulated dust, dirt and debris from coil fins, cleaning of drain tray, condensate drain line, filters, blower/impeller, motor exterior and internal AHU casing, checking of belts, bearings, dampers, electrical connections and other AHU components for proper functioning, reassembly of all components after cleaning, testing and commissioning of AHU after servicing, and submission of inspection report indicating any defects, repairs or replacements required. The scope shall include all labour, tools, coil cleaning chemical, transportation and safety equipment complete as required and as directed by Engineer-in-Charge. No spare parts is included in this item. | 6 | Each |
| 5 | Supply, dosing, circulation and application of approved descaling chemical for removal of scale, silica and hardness deposits from Hot Water Generator system (Having 2 X 600 KW Hot water Generator), including flushing and cleaning of all piping network in A9, A10, A11, A12, A13, A14, A16 blocks, complete as required and as directed by Engineer-in-Charge. | 80 | Ltr. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054