Inquiry NowRural Piped Water Supply To Ku in Koraput - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Rural Piped Water Supply To Ku" in Koraput, India.
- Opening Date : Wed 26th November, 2025
- Closing Date : Tue 25th November, 2025
- ₹ 1772064.00
- NTID 42777256
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
18000.00 -
Document Cost
6000.00 -
Estimated Cost
1772064.00
BOQ Items Total Items : 85 | Total Qty : 2859.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CONSTRUCTION OF 50,000 LTR Capacity RCC OGR | ||
| 2 | Designing , construction, testing and commissioning of 50,000 ltr capacity circular shape flat bottom with domb shape RCC on the ground reservoir(OGR) including supplying , fitting, fixing of M.S and aluminuim ladder , water level indicator, lightening arrester 1 nos. 80 mm CI puddle collar-4, 2 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 18 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixing 80 CI sluice valves-2 Nos, Sluice valve chamber -2 nos of standard make providing CC M-25 for RCC work with 20mm & down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofing weather coat etc. all complete as per approved drawing and design as per direction of Engineer-in-Charge. | 1.000 | No |
| 3 | CONSTRUCTION OF PUMP HOUSE | ||
| 4 | Supplying all labour, T&P and materials for earth work excavation in foundation in all kinds of soil with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the Engineer-in-charge. | 7.290 | cum |
| 5 | Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge. | 1.220 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054