- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of General Services Organisation
- >
NTID 47109430
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRevamping Of Branch Sewer Line in Kalpakkam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Revamping Of Branch Sewer Line" in Kalpakkam, India.
General Services Organisation
Kalpakkam, Tamil Nadu, India
NTID 47109430
- Opening Date : Fri 6th November, 2026
- Closing Date : Thu 5th November, 2026
- ₹ 3530000.00
- NTID 47109430
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
70600.00 -
Document Cost
Refer Documents -
Estimated Cost
3530000.00
BOQ Items Total Items : 49 | Total Qty : 4466.15
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavating trenches of required width by mechanical means (Hydraulic excavator / manual means) for pipes, cables etc., for depth upto 1.5m in all kinds of soil including excavation for sockets, dressing of sides, ramming of bottoms, getting out the excavated soil and then refilling the soil as required in layers not exceeding 200mm in depth, consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed within a lead of 50m, (Disposed soil to be levelled by breaking clods, if any and neatly dressed), etc., all complete as per specification. | ||
| 2 | All kinds of soil upto 1.50mtr depth | 400 | Cu.m. |
| 3 | All kinds of soil exceeding 1.50 mtr depth but not exceeding 3.00 mtr depth | 60 | Cu.m. |
| 4 | Filling available selected excavated earth (excluding rock) available at site with in lead of 500m in trenches, plinth, sides of foundation, etc., in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming and watering, levelling and dressing the top surface, lead upto 200m and lift upto 1.5m etc., all complete as per specification. | 100 | Cu.m |
| 5 | Providing a system for dewatering and drainage of water from site to main drain so as to retain the excavated formation dry for the duration required including all equipments, consumables, site protection, etc., all complete as per specifications and as directed by Engineer- in-Charge. | 600 | Kwh |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054