- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of KERALA WATER AUTHORITY
- >
NTID 43233358
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRetender-stateplan 2025-26 Rep in MAVELIKKARA - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Retender-stateplan 2025-26 Rep" in MAVELIKKARA, India.
KERALA WATER AUTHORITY
MAVELIKKARA, Kerala, India
NTID 43233358
- Opening Date : Tue 30th December, 2025
- Closing Date : Mon 29th December, 2025
- ₹ 1038806.00
- NTID 43233358
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
25970.00 -
Document Cost
2760.00 -
Estimated Cost
1038806.00
BOQ Items Total Items : 21 | Total Qty : 2570.6
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | APPENDIX A :- LAYING PIPE LINE - WORKING CHARGES. | ||
| 2 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 402.000 | metre |
| 3 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 241.200 | sqm |
| 4 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 171.080 | cum |
| 5 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 73.320 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054