Inquiry NowRestoration Work Of Collapsed in Orai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Restoration Work Of Collapsed " in Orai, India.
UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED
Orai, Uttar Pradesh, India
NTID 45439043
- Opening Date : Thu 11th June, 2026
- Closing Date : Thu 11th June, 2026
- ₹ 0.00
- NTID 45439043
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
150000.00 -
Document Cost
1770.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 47 | Total Qty : 20905.567
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Attending breakdown and Restoration of 220kv Orai-Parichha ckt 3and 220kv Orai-Moth D/C line (Damage of 18 No tower by replacement of 220 KV DC Tower along with foundation work & including dismantling up damage towers,shifting of material from above site to substation store within 60 KM with de-stringing ,re-stringing of ACSR Zebra Conductor, Earthwire along with all associated works. | ||
| 2 | Immediate diversion/Mobilization of gang for dismantling of collapsed tower with re-storation of electric supply of effected Substation 220 kV S/S moth and Parichha TPS with all T & P and man power required for completion of the work in minimum period . | 1 | Job |
| 3 | Round the clock watch & ward of the line/ Line materials during line restoration work to avoid theft of conductor, Earthwire, tower part, hardware fitting, conductor / Earthwire and other accessories etc. between section tower No. 239 to tower no. 243 and 256 to 275 . | 60 | Day |
| 4 | Arrangement of anchoring/back stay of conductor at 5 different location No. for both Ckt where ever is required with the help of 18mm wire rope to avoid tower collapse/ x-arm damage of other towers. | 5 | Job |
| 5 | De-stringing of Earthwire between tower no. between section from tower No. 239 to 243 and tower no. 256 to tower no.275 including hardware fitting. | 8.375 | km |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054