NTID 46403245
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRestoration Of Rain Damages On in Sirmaur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Restoration Of Rain Damages On" in Sirmaur, India.
Public Works Department
Sirmaur, Himachal Pradesh, India
NTID 46403245
- Opening Date : Wed 26th August, 2026
- Closing Date : Tue 25th August, 2026
- ₹ 3005078.00
- NTID 46403245
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
60500.00 -
Document Cost
2000.00 -
Estimated Cost
3005078.00
BOQ Items Total Items : 1 | Total Qty : 17670.69
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in earthwork in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification for Rural Road, August, 2004 and clause 16.2 of General Conditions for Contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, trimming, filling of unevenness, blindage and finishing of the road to specified dimensions or as directed by the Engineer-in charge for smooth riding. The recovery of useful stone that is 749.56cum. (Seven Hundred Forty Nine point Fifty Six Cubic Metre) in all cases, @ Rupees 300/= only (Rupees Three hundred ) per cubic metre shall be effected on pro rata basis. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. | 17670.69 | Per cubic metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054