- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Minor Irrigation Department
- >
NTID 44411230
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRestoration Of Main Canal Of K in Sambalpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Restoration Of Main Canal Of K" in Sambalpur, India.
- Opening Date : Tue 24th March, 2026
- Closing Date : Mon 23rd March, 2026
- ₹ 7921122.00
- NTID 44411230
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
79211.00 -
Document Cost
10000.00 -
Estimated Cost
7921122.00
BOQ Items Total Items : 14 | Total Qty : 15478.85
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation,loading,unloading and carriage by mechanical means in all kinds of soil including stoney earth,gravel and moorum etc interspread with boulders upto 0.5cum size with all lift and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer in charge within an initial lead of 1km from the place of excavation complete.(Measurement is to be taken on finished level section.) | 6478.00 | Cum |
| 2 | Dismantling brick or stone masonary work in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50M lead as directed by the Engineer-in-charge. | 244.78 | Cum |
| 3 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50M lead as directed by the Engineer-in-charge. | 184.43 | Cum |
| 4 | Excavation of foundation and plinth in all kind of soil with all leads and lifts including dressing and levelling the bed to proper slope and level making it fit for laying concrete including depositing the excavated materials clear of work site with all leads and lifts and delifts including labour, T&P materials required for the item complete as directed by the Engineer-in-charge. | 95.28 | Cum |
| 5 | Filling foundation and plinth with sand including watering and ramming etc complete and including cost, conveyance,royalty and taxes of all materials all labour & T&P required for the work etc complete in all respect as directed by the Engineer -in- charge. | 16.64 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054