Inquiry NowResidual Work And Construction in East Singhbhum - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Residual Work And Construction" in East Singhbhum, India.
WATER RESOURCES DEPARTMENT
East Singhbhum, Jharkhand, India
NTID 44934861
- Opening Date : Mon 4th May, 2026
- Closing Date : Sat 2nd May, 2026
- ₹ 9916083.00
- NTID 44934861
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
198500.00 -
Document Cost
10000.00 -
Estimated Cost
9916083.00
BOQ Items Total Items : 25 | Total Qty : 9571.809
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | DI Pipe : Providing and Supplying ISI mark Centrifuggaly cast (Spun) Ductile Iron Pipes (Class K-9) of 100 mm and above all diameter for water works with socket & spigot ends confirming to IS 8329/2000 in the standard working lengths of 4.5, 5.5 & 6m suitable for classification K-7 & K-9 suitable for push-on-joint (rubber gusket D jointing) with cement mortar lining inside the pipes with outside zinc and bittuminous coating. Rates are FOR rate including Inspection & carriage upto site including Contractor profit & overhead charges etc. eccluding GST. DWSD, Jharkhand SOR - M 1026 & Add 10% CP.: 900mm Dia | 250.0000 | m |
| 2 | A) Earth work in excavation (As per IS. 3114/1965) for laying of different types and sizes of pipes so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification and direction of Engineer in charge (Classification soil item B) (DWSD SOR 3.1.1.1) - 60% of excavated earth. | 1262.760 | m3 |
| 3 | B) Earth work in excavation in ordinary rock or soft rock (where blasting is not needed) (Vide classification of soil item-C) with initial lead of 10M and lift of 1.5M including dressing making the sides in proper profile and dressing the bed in proper grad etc. all complete as per specification and direction of E/I. ) (JH WRD 7.1.12.2) -40% of excavated earth | 841.840 | m3 |
| 4 | Earth work in back filling the trenches after laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction of Engineer- in- charge. (For classification for Soil item- A & B). (JH-DWSD-SOR-3.1.1.2) | 1856.270 | m3 |
| 5 | Providing coarse clean sand in filling in foundation trenchesor in plinth includingrall materials, labour, royalty and taxes all complete as per building specificationand direction E/I. (Mode of measurement compacted volume) [JH-BCD-SOR-5.1.10] | 72.940 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054