- Home
- >
- Tender
- >
- Delhi Tender
- >
- Department of DELHI DEVELOPMENT AUTHORITY
- >
NTID 44691547
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowReplacing Damaged Flooring Of in Delhi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Replacing Damaged Flooring Of " in Delhi, India.
- Opening Date : Mon 6th April, 2026
- Closing Date : Sat 4th April, 2026
- ₹ 9127901.00
- NTID 44691547
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
182559.00 -
Document Cost
Refer Documents -
Estimated Cost
9127901.00
BOQ Items Total Items : 19 | Total Qty : 13850
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. a)Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 702.00 | cum |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. a) All kinds of soil | 2880.00 | sqm |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: a) All kinds of soil | 1800.00 | sqm |
| 4 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 1255.00 | metre |
| 5 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost) | 628.00 | metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054