- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of UTTARAKHAND POWER CORPORATION LIMITED
- >
NTID 44953015
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowReplacement Of Acsr Bare Condu in Udhamsign Nagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Replacement Of Acsr Bare Condu" in Udhamsign Nagar, India.
UTTARAKHAND POWER CORPORATION LIMITED
Udhamsign Nagar, Uttarakhand, India
NTID 44953015
- Opening Date : Thu 7th May, 2026
- Closing Date : Wed 6th May, 2026
- ₹ 0.00
- NTID 44953015
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
394000.00 -
Document Cost
11800.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 37 | Total Qty : 74150.096
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Annexure-A (LABOUR CHARGES) | ||
| 2 | Chemical Earthing including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor), connecting the same with G.I. Strip (to be supplied by contractor) of size 35x6 mm for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. | 39 | Nos. |
| 3 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. | 110 | Kg. |
| 4 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. | 7.92 | CBM |
| 5 | Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. | 8 | Nos. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054