Inquiry NowRepairs replacement And Day To in Vadodara - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repairs replacement And Day To" in Vadodara, India.
- Opening Date : Thu 26th March, 2026
- Closing Date : Tue 24th March, 2026
- ₹ 2500000.00
- NTID 44305810
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
500.00 -
Estimated Cost
2500000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
BOQ Items Total Items : 148 | Total Qty : 4672
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling/taking out non clogg submersible sewage pump set complete 7.5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed. Note : 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump. 3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 1.00 | EACH JOB |
| 2 | Dismantling/taking out non clogg submersible sewage pump set complete 5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed. Note : 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump. 3. The contractor should get the repairing work done at the installation in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 1.00 | EACH JOB |
| 3 | M & L for rewinding to motor stator winding of capacity 7.5 HP non-clog submersible pump set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for 'F' class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed | 1.00 | EACH JOB |
| 4 | M & L rewinding to motor stator winding of capacity 5 HP non-clog submersible pump set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for 'F' class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed | 1.00 | EACH JOB |
| 5 | Dismantling / taking out non clog centrifugal/monoblock sewage pump set complete 5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gasket/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed. Note:- 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump. 3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 4.00 | EACH JOB |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054