- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of MUNICIPAL CORPORATION
- >
NTID 42850674
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepairs Of Damage Road And Res in Tirunelveli - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repairs Of Damage Road And Res" in Tirunelveli, India.
MUNICIPAL CORPORATION
Tirunelveli, Tamil Nadu, India
NTID 42850674
- Opening Date : Mon 24th November, 2025
- Closing Date : Mon 24th November, 2025
- ₹ 1000000.00
- NTID 42850674
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10000.00 -
Document Cost
Refer Documents -
Estimated Cost
1000000.00
BOQ Items Total Items : 3 | Total Qty : 1046.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications Providing and laying 50mm consolidated thick Bituminous Macadam using course aggregate and VG 30 bitumen which should consist of construction in a single course base/binder course confirming to the specification on a prevoiusly prepared base (using Mini Hot Mix plant and Power roller)including cost of material labour charges rentals for machinery fuel and all other incidental charges etc.complete as per clause 504 MORTH Rev-5 (For Patch Works) Providing and laying Bituminous Concrete upto 30 mm thick using 0.13 cum of 19.00-9.50mm, graded metal 0.17 cum of 9.50-2.36mm graded metgal and 0.26 cum of 2.36 and below metal by adding the shredded plastic waste over the aggregate heated to 170 degree celcious in the centeral hot mix plant, mixed well with 45.27 Kgs of hot bitumen VG30 Bitumen (160 degree celcious) 60/70 grade for premixing per 10sqm to lay 30mm compacted thick of bituminious concrete includeding the cost of materials ( the cost of Municipality / Corporation plastic waste obtained by the contractor from the Municipality / Corporation will be recovered) and conveyance of all materials to CMP site, heating the bitumen and agregates to the required tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required tempereature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory roller / Pneumatic roller to therequired density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30 TCMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, Vibratory/pneumatic rollers and all other tools and plants required, including all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH REV -5 Specifications. | 417.00 | sqm |
| 2 | Earth work excavation for foundation complete direction as per the Dept.officers (100mm). Conveyance of Excavated earth complete directions as per the dept officers (5Km0 (40% of earth work Qty) Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications Providing and laying Bituminous Concrete upto 30 mm thick using 0.13 cum of 19.00-9.50mm, graded metal 0.17 cum of 9.50-2.36mm graded metgal and 0.26 cum of 2.36 and below metal by adding the shredded plastic waste over the aggregate heated to 170 degree celcious in the centeral hot mix plant, mixed well with 45.27 Kgs of hot bitumen VG30 Bitumen (160 degree celcious) 60/70 grade for premixing per 10sqm to lay 30mm compacted thick of bituminious concrete includeding the cost of materials ( the cost of Municipality / Corporation plastic waste obtained by the contractor from the Municipality / Corporation will be recovered) and conveyance of all materials to CMP site, heating the bitumen and agregates to the required tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required tempereature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory roller / Pneumatic roller to therequired density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30 TCMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, Vibratory/pneumatic rollers and all other tools and plants required, including all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH REV -5 Specifications. (Plastic 8%) | 293.50 | sqm |
| 3 | Supplying and filling foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc.complete complying with standared specifications (75mm thick) Plain Cement Concrete M20 (1:1.5:3) (one cement one and Half fine aggregates and Three Course aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing laying and labour charges etc.complete as per standard specification (75mm thick) | 336.00 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054