- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Military Engineer Services
- >
NTID 44123913
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Repairs cleaning in Nilgiris - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Repairs cleaning" in Nilgiris, India.
Military Engineer Services
Nilgiris, Tamil Nadu, India
NTID 44123913
- Opening Date : Mon 23rd March, 2026
- Closing Date : Fri 20th March, 2026
- ₹ 3500000.00
- NTID 44123913
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
70000.00 -
Document Cost
500.00 -
Estimated Cost
3500000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
BOQ Items Total Items : 65 | Total Qty : 6808.08
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | De-sludging, Cleaning and dewatering of sludge(liquid) from septic tank through pumping set or other mechanical means including cleaning of sludge/grass/bushes and disposing off sludge in the excavated pit as directed by Engineer-in-Charge including spreading bleaching powder and filling of pit by earth complete as specified and as directed.. Note :- (i) Earth to be filled over the pit shall be filled after sufficient absorption of liquid and size of pit shall be made accordingly. (ii) To avoid any health hazard or spreading of any foul gas, bleaching powder shall be spread as directed by the Engineer-in-charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc shall be deemed to be included in the rate quoted under this item but supply of bleaching powder shall be measured and paid separately. | 30.00 | CUM |
| 2 | De-sludging/cleaning completely of solid sludge by pumping and or manually from inside the septic tank and removal of sludge to a distance as directed by Engineer-in-Charge and depositing the sludge in a excavated pit of appropriate size as directed duly filled up with earth in layers of 30 cm thick including spreading bleaching powder and taking out RCC manhole cover slab for cleaning and resetting in CM 1:6 after cleaning complete as specified and as directed. Note :- (i) Earth to be filled over the pit shall be filled after sufficient absorption of liquid and size of pit shall be made accordingly. (ii) To avoid any health hazard or spreading of any foul gas, bleaching powder shall be spread as directed by the Engineer-in-charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc shall be deemed to be included in the rate quoted under this item but supply of bleaching powder shall be measured and paid separately. | 25.00 | CUM |
| 3 | Cleaning of sewage drain pipe of stone ware pipe, RCC Hume pipe , PVC pipe of 75 mm bore by rodding with sectional sewer rod/flexible sewer rod/bucket etc thoroughly from inspection chamber to man hole or from one manhole to another manhole of any depth and size and well flushing with water after cleaning including removal of sludge and other materials obtained from cleaning the drain pipe and manhole garbage to a pit made for this purpose and filling up the earth complete as specified and as directed. Note :-(i) Cleaning of sewage line to be started from down stream side in this operation for which some pipe line gets cleaned automatically which needs to be cleaned by rodding only and hence the same shall not be measured (ii) The unit rate of the items shall be deemed to be included for the cost of removal of sludge/waste and water accumulated in manhole/inspection chamber due to cleaning of drain by rodding etc. (iii) The sludge obtained shall be deposited in an excavated pit and filled up with earth in layers of 30cm thick as directed by Engineer-in-Charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc. shall be included in the rate quoted under this item but supplying of bleaching powder shall be measured and paid separately. (iv) To avoid any health hazard or spreading of any foul gas bleaching powder shall be spread over each earth layers as directed by Engr-in-Charge. | 60.00 | RM |
| 4 | All as per item No.3.00 above but bore of pipe 100mm | 300.00 | RM |
| 5 | All as per item No.3.00above but bore of pipe 150mm | 600.00 | RM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054