Inquiry NowRepairing And Surfacing Of Exi in Puruliya - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repairing And Surfacing Of Exi" in Puruliya, India.
DEPARTMENT OF PASCHIMANCHAL UNNAYAN AFFAIRS
Puruliya, West Bengal, India
NTID 47108287
- Opening Date : Fri 13th November, 2026
- Closing Date : Fri 6th November, 2026
- ₹ 7819791.00
- NTID 47108287
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
156500.00 -
Document Cost
Refer Documents -
Estimated Cost
7819791.00
BOQ Items Total Items : 18 | Total Qty : 6673752.26
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | FLEXIBLE PAVEMENT | ||
| 2 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201). | 0.45 | HEC |
| 3 | Restoration of Rain Cuts Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for 300 mm width and extending continuously for a sufficient length and height of benches shall be in the range of 150- 300mm. Fresh material shall be deposited in layers not exceeding 250 mm and compacting with plate compactor or power rammers or by suitable implements handled manually to restore the original alignment, levels and slopes as per the requiremnt of MORT&H's specification 3002. | 1170 | CUM |
| 4 | Hard Shoulder with Moorum Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. for Hard Shoulder on both side of Carriageway | 270 | CUM |
| 5 | Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm. Removal of all failed material,in the pavement courses and if necessary below the pavement,until the root causes of the failure is removed, the trimming of completed excavation to provide firm vertical faces; specified for the pavement layer; application of tack coat conforming to cl. 503 of MORT&H's specification ,on to the sides and base of excavation prior to placing hot bituminous material as per clause 510 and the compaction,trimming and finishing of the surfaces of all patches to form a smooth continuous surface, level with the surrounding road as per the requirement of clause 3004.2 of MORT&H's specification . Stone Materials : Pakur Variety | 225 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054