ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair stabilizat Ion Of Slope in Doda - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair stabilizat Ion Of Slope" in Doda, India.
JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED
Doda, Jammu and Kashmir, India
NTID 44939432
- Opening Date : Tue 12th May, 2026
- Closing Date : Mon 11th May, 2026
- ₹ 67956000.00
- NTID 44939432
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1359128.00 -
Document Cost
5000.00 -
Estimated Cost
67956000.00
BOQ Items Total Items : 20 | Total Qty : 131307.72
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Engagement of labours for cleaning loose rock and other loose material. | 66.000 | Days |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 750.000 | Cum |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V including curing but excluding the cost of centring, shuttering and finishing with. 1:1 :3 (1 cement :1 coarse sand: 3 graded stone aggregate 20 mm nominal size) | 2401.300 | cum |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level | 801.000 | cum |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters | 2361.900 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054