NTID 44185498
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair Of 1580 Meter At Nh Ser in Barbil - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair Of 1580 Meter At Nh Ser" in Barbil, India.
- Opening Date : Thu 12th March, 2026
- Closing Date : Wed 11th March, 2026
- ₹ 71706000.00
- NTID 44185498
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
717100.00 -
Document Cost
11800.00 -
Estimated Cost
71706000.00
BOQ Items Total Items : 15 | Total Qty : 15397.1
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Road Work | ||
| 2 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineerin- charge within an initial lead of 1 km from the place of excavation complete as per direction of EIC. | 480.00 | Cum |
| 3 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately as per direction of EIC. | 2212.00 | Cum |
| 4 | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all labours,T & P required for the work etc. Complete as directed by EIC. | 521.40 | Cum |
| 5 | P.C.C M-15 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect in foundation base. | 24.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054