- Home
- >
- Tender
- >
- Haryana Tender
- >
- Department of Military Engineer Services
- >
NTID 43117847
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair Maintenance Of Lt Cabl in Gurgaon - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair Maintenance Of Lt Cabl" in Gurgaon, India.
- Opening Date : Thu 1st January, 2026
- Closing Date : Tue 30th December, 2025
- ₹ 4500000.00
- NTID 43117847
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
90000.00 -
Document Cost
500.00 -
Estimated Cost
4500000.00
BOQ Items Total Items : 112 | Total Qty : 7885.13
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Comprehensive, preventive and periodical maintenance of total 2 Nos UPS of capacity (60 KVA- 01 Nos, Sr No. 9190501007, 250 KVA- 01 Nos Sr No. 9190800391, make/model: DPA U SCALE /ABB, By inspecting the all units and carry out quarterly as a part of preventive maintenance, with relevant PM checklist.by Cleaning up of Unit, Visual Inspection to check any deformation, Checking and Adjustment (If needed) of Power parameters like input. Output, DC voltage & Current, Checking and Adjustment of Control parameters on different PCBs,Tightness of all connection,Functional Checking up of Rectifier section, Functional Checking up of Inverter section, Functional Checking up of Static Switch Section, With user approval, perform operational test of the system including unit transfer and battery discharge, Attending to complain breakdown calls whenever required, UPS failing to transfer to battery mode in the event of incoming power failure, Battery Breaker tripping due to battery failure, Battery Failure, UPS unable to transfer load on to the parallel UPS (Redundancy Failure), UPS tripping on High temperature conditions, Control Card, major components failure such as IGBT s, SCR s & Wire wound Components within the UPS, Module Failure, Wire Harness damage, Reporting the healthiness of the plant and suggesting improvements if any, all as directed and specified by Engr-in-charge. Defective parts discovered during maintenance repaired or replaced by new or as new parts. Spares replaced will be either of the same make or equivalent. Old/U/sParts removed shall be property of contractor. Batteries bank replacement is not part of Comprehensive AMC Contract.(NCN) | 10.00 | per month |
| 2 | Comprehensive, preventive and periodical maintenance of total 2 Nos UPS of capacity (10 KVA- 02 Nos, Sr No. ZOV18C00298WT & Sr No. ZOV18600305WT ,Make- Delta, Model :GES103HH, By inspecting the all units and carry out quarterly as a part of preventive maintenance, with relevant PM checklist.by Cleaning up of Unit, Visual Inspection to check any deformation, Checking and Adjustment (If needed) of Power parameters like input. Output, DC voltage & Current, Checking and Adjustment of Control parameters on different PCBs,Tightness of all connection,Functional Checking up of Rectifier section, Functional Checking up of Inverter section, Functional Checking up of Static Switch Section, With user approval, perform operational test of the system including unit transfer and battery discharge, Attending to complain breakdown calls whenever required, UPS failing to transfer to battery mode in the event of incoming power failure, Battery Breaker tripping due to battery failure, Battery Failure, UPS unable to transfer load on to the parallel UPS (Redundancy Failure), UPS tripping on High temperature conditions, Control Card, major components failure such as IGBT s, SCR s & Wire wound Components within the UPS, Module Failure, Wire Harness damage, Reporting the healthiness of the plant and suggesting improvements if any, all as directed and specified by Engr-in-charge. Defective parts discovered during maintenance repaired or replaced by new or as new parts. Spares replaced will be either of the same make or equivalent. Old/U/sParts removed shall be property of contractor. Batteries bank replacement is not part of Comprehensive AMC Contract. | 10.00 | per month |
| 3 | Comprehensive, preventive and periodically maintenance of the Main LT Panel: Capacity - 2 No. 1250 A 4P, 50kA (Ics=Icu=Icw for 1s) EDO ACB LSIG with microprocessor based built-in over current, earth fault, short circuit releases, auxiliary contacts, status indication on release, release healthiness indication & ON-OFF-TRIP indication for each and necessary protection CT's of suitable ratings. (For transformer ), 2 No. 1250 A 4P, 50kA (Ics=Icu=Icw for 1s) EDO ACB LSIG with microprocessor based built-in over current, earth fault, short circuit releases, auxiliary contacts, status indication on release, release healthiness indication & ON-OFF-TRIP indication for each and necessary protection CT's of suitable ratings. (For DG ) Bus coupler- 1 No 1250 FP ACB 50 kA . The Interlocking in the main incoming ACB's to be done as per the DG AMF Panel Load management & Load sharing is to be done through DG controller & controller of DG shall be interlocked through DG AMF Panel. First DG will act as master & second DG will act as slave ( Both the DG shall be programmed such that both could run for no of hours ) Along with PLC Micro 830 for the Auto operation. Outgoings:- 2 Nos 800 A ACB - 50 kA & , 5 Nos. 100 A FP MCCB (16 kA/1 sec), 4 Nos. 63 A FP MCCB (16 kA/1 sec) , 2 No. 40 A FP MCCB (16 kA/1 sec) , 1 No. 25 A FP MCCB (16 kA/1 sec) , 1 No. 500 A FP MCCB (16 kA/1 sec) by carry out preventive maintenance of the complete panel on quarterly basis, checking the all control wiring, breaker, relay's and other related accessories of the panel like load manager, control MCB's, contactor's ..etc. Attending to all breakdown complaints whenever required, carry out external cleaning. | 10.00 | per month |
| 4 | Comprehensive, preventive and periodically maintenance of the APFC PANEL : 195 Kvar - Main I/C- 1 Nos.500A TP MCCB 16 kA (O/C, S/C, E/F). Terminals suitable to receive suitable aluminum armored cable connection on one side and Busbar connection on the other side. 1 Nos contactor- 400 A, AC6b, 3pole, relay- 3 phase outgoing:- 2 No. 125 A TP MCCB, 16kA (Ics=Icu), along with ON-OFF indication lamps & push button switch. 3 pole capacitor grade contactor suitable for automatic switching of 50 kVAR capacitor bank, 1 No. 80 A TP MCCB, 16kA (Ics=Icu), along with ON-OFF indication lamps & push button switch, 3 pole capacitor grade contactor suitable for automatic switching of 25 kVAR capacitor bank, 3 pole capacitor grade contactor suitable for automatic switching of 10 kVAR capacitor bank, 10 kVAR hermetically sealed metallized polypropylene capacitor units complete with fuse protection, discharge resistors, interconnections etc., 6 Nos. 16 A TP MCCB, 16kA (Ics=Icu), along with ON-OFF indication lamps & push button switch. 5 kVAR hermetically sealed metallized polypropylene capacitor units complete with fuse protection, discharge resistors, interconnections etc. complete as required. 1 No. 12-step APFCR and allied control wiring with in-built power factor meter. By inspecting the allsystem and carry out quarterly as a part of preventive maintenance, with relevant PM checklist.checking the all control wiring, breaker, relay's and other related accessories of the panel like load manager, control MCB's, contactor's ..etc. Attending to all breakdown complaints whenever required, carry out external cleaning,all as directed and specified by Engr-in-charge. | 10.00 | per month |
| 5 | Note for item no:1 to 4 (i) The tenderer shall have to replace the U/s material with OEM material only. The cost of replacement of minor/major spare parts will not be paid seperatly. Old material will be the poperty of contractor and credit included in the rate quoted. (ii) In case any accident occur of any Indl like Mechanic/Helpers/users during maintenance/operation of above mentioned Airconditioner/unit, contractor is liable to pay compensation to the Indl as decided by the competent authority. Principal Employer will not be responsible for the same. (iii) If complaint is not attended by contractor with in five hour the penality of Rs 1000/ per hour to be imposed and amount of penality will be deducted from RAR. (iv) The cost of transportation (to and fro) for all kind of necessary equipment / T&P shall be arranged/brought by contractor to complete the job at site , stationary for maintenance of record, no extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically ,so contractor to specify the telephone no who will receive the complaint round the clock. After attending the complaint contractor will obtain the signature from rep of User/AGE/GE every day as a token of complaint attended. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054