- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 44011648
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair And Renovation Of Colle in Keonjhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair And Renovation Of Colle" in Keonjhar, India.
- Opening Date : Fri 27th February, 2026
- Closing Date : Thu 26th February, 2026
- ₹ 38564495.00
- NTID 44011648
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
385700.00 -
Document Cost
10000.00 -
Estimated Cost
38564495.00
BOQ Items Total Items : 104 | Total Qty : 12424.98
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORKS (PART-I) Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Ground Floor | 1,374.680 | sqm |
| 2 | Dismantling and removing old tiles flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Ground Floor | 892.100 | sqm |
| 3 | Dismantling and removing R.C.C. Colums, Beams, Slab, staircase, landing, lintels including stacking the useful materials for reuse and removing the debris within 50m lead etc.as per direction of Engineer-in-charge. complete including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Ground Floor | 7.830 | cum |
| 4 | Dismantling double Nuria tileroofing (Tiles only) including stacking the useful materials for reuse and removing the debris within 50m lead complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) 1st Floor | 665.810 | sqm |
| 5 | Dismantling Wood Work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level including T&P and scaffolding wherever necessary, sorting the dismantled materials, disposal of unserviceable materials and stacking the serviceable material with all lifts and lead of 1000 metres complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) 1st Floor | 58.370 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054