Inquiry NowRepair And Reconstruction Of D in Barbil - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair And Reconstruction Of D" in Barbil, India.
- Opening Date : Fri 20th March, 2026
- Closing Date : Thu 19th March, 2026
- ₹ 1067000.00
- NTID 44375743
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10670.00 -
Document Cost
6000.00 -
Estimated Cost
1067000.00
BOQ Items Total Items : 14 | Total Qty : 820.85
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cleaning nubbish, sludge, weeds scum, liquid earth, mud etc. from road side masonry drain nikashi etc. by mathor labour after removing concrete slab/ manhole cover etc. without damaging the same and re-fixing the same properly after cleaning as necessary and removing the sludge etc. by using iron pans, buckets including all labour, tools and plants including expulsion of impure/ inflammable/ asphyxiating gases from the drain etc. and removing the spoils in dry condition and disposing the same by truck beyond the area of municipal corporation/ municipality/ NAC/Industrial township authority etc. for such disposal including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. and cleaning the road side complete as per direction of Engineer-In-charge, (Land for disposal to be arranged by the Contractor)(Payment will be made on the basis of actual stack measurement of spoils in dry condition at road side. | 140.00 | Rmt |
| 2 | Dismantling Rein forced cement concrete incl. stacking the useful materials for reuse & removing the debris within 50mtr lead . | 7.20 | Cum |
| 3 | Earth work excavation of foundation in stony earth and gravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed. | 40.50 | Cum |
| 4 | Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete. | 8.25 | Cum |
| 5 | Plain cement concrete (1:3:6) using 40 mm. size CBHG stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. | 6.60 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054