Inquiry NowRenovation Of Western Side Jet in Kavaratti - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Western Side Jet" in Kavaratti, India.
ANDAMAN LAKSHADWEEP HARBOUR WORKS
Kavaratti, Lakshadweep, India
NTID 45771871
- Opening Date : Fri 7th August, 2026
- Closing Date : Thu 6th August, 2026
- ₹ 14785071.00
- NTID 45771871
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
295701.00 -
Document Cost
Refer Documents -
Estimated Cost
14785071.00
BOQ Items Total Items : 17 | Total Qty : 1282
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | ABSTRACT - I - Renovation of Western side Jetty at Kadmath (Approach) - (Balance work) Dismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete. | 99.00 | Cum |
| 2 | RCC 1:0.9:1.80 using 20mm graded stone jelly for RCC pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab RCC slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid seperately, including cost of cement, granite jelly, M sand, all labour chrges for screening and wshing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing, consolidation with vibrator, curing and transportation charges of all other materials to work site, hire charges and running expenses of concrete mixer machine and vibrator, etc. complete. | 85.00 | Cum |
| 3 | Providing and laying RCC with 1:11/2:3 mix (1cement, 11/2 M sand, 3 20mm chips) for Handrail posts, handrails and lightpost etc as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete | 5.00 | Cum |
| 4 | Centering and shuttering for Handrail posts, handrails and lightpost etc including cost of all materials (Cement, M Sand, 20mm Chips), form work, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools as per the direction of EIC etc complete. | 110.00 | Sqm |
| 5 | Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Kadmath, cost of binding wires, all T&P required for the work and minor tools etc. complete. | 150.00 | Qtls |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054